 |
Restoration Observations October 2008 |
|
|
| |

|
This pony wall framing will form the north end of the orchestra level once it is poured in concrete. The extensive trenching will accommodate large conduits that will be used to take signals from a sound and light station to the wings of the stage.
|
 |
|

|
|
|
|
|

|
|
Untitled Document
|
| |